Installation
01. Versatile Facade Layout
The positioning of the brackets and vertical aluminum profiles is completely independent of the vertical joints in the facade panel layout, offering the architect complete freedom in design.
02. Installation of Vertical Profiles
The vertical rails are secured to the wall using one dead-load bracket and multiple wind-load brackets, depending on the project wind loads. These brackets are anchored to the substrate with the appropriate fasteners.
03. Installation of Horizontal Profiles
The “J” profiles are attached to the vertical profiles using self-drilling screws. The placement of the horizontal profiles should follow NEOLITH’s shop drawings, prepared according to the architect’s facade panel layout.
04. Installation of EPDM gaskets
Once the “J” Profile is securely fastened, install EPDM gaskets every 25-30 cm (10-12’’) directly into the “J” profile to ensure a proper connection between the panel and the horizontal channel, preventing any potential movement caused by wind.
05. Installation of Neolith Cladding
Neolith panels come from the factory with the hanger/closer profiles already embedded into the back, allowing them to be easily hung from the “J” Profile. Installation begins at the base of the facade and progresses upward. This system is designed for quick installation and facilitates easy panel replacement without damaging adjacent panels, if necessary.