Hidden undercut system
This system is composed of brackets, vertical profiles, horizontal profiles, and clips, all made from aluminum.
Installation
01. Facade Layout
The positioning of the brackets and vertical aluminum profiles can be done independently of the vertical joints in the facade layout.
02. Installation of Vertical Profiles
The vertical profiles are secured to the wall using support and retention brackets with anchors to ensure stability.
03. Installation of Horizontal Profiles
The horizontal profiles are attached to the vertical profiles using self-drilling screws. The exact placement of the horizontal profiles should follow the facade layout plan.
04. Installation of Neolith Cladding
Once the clips are fixed to the back of the Neolith panels using expansion anchors, the installation starts from the base of the facade. This facade system allows for quick installation and makes it easy to replace tiles if necessary.