HR System


Fastening system

Mechanical attachment system

Fastening type

Concealed fasteners

Thickness

12mm+ & 20mm

Outlet

Adjustable build-up

Sistema HR

Similar to the Strongfix System, it offers the flexibility to create various cladding designs using the same profile configuration. Panels can be installed with aligned joints, staggered joints, or random joints, allowing for diverse aesthetic possibilities.

For optimal installation, it is recommended to maintain a minimum vertical joint of 5 mm between panels, along with a minimum horizontal joint of 6 mm, which is determined by the spacing of the horizontal profiles.

Hidden mechanical facade system

This system consists of brackets, vertical profiles, and horizontal profiles, all constructed from aluminum.

Installation process

The installation of the vertical profiles to the substrate is achieved using dead-load and wind-load brackets, which are securely anchored. These brackets ensure proper leveling of the vertical profiles and allow for adjustments to correct any irregularities in the supporting wall of the façade.

Once the vertical profiles are installed, the horizontal profiles -varying based on their position on the façade- are attached to the vertical profiles using self-drilling screws.

Panel installation occurs concurrently with the attachment of the horizontal profiles, starting from the bottom and working upward. Prior to positioning the panels, a polyurethane sealant is applied to the grooved edges to prevent movement caused by wind and address any gaps in the recessed grooves.

Other installation systems

VM System

VM System

Sistema HC

HC System

Sistema HC Slim

HC Slim System

Sitema HC-R

HC-R System

Sistema HU

HU System

Sistema Strongfix

Strongfix System