HC Slim System


Fastening system

Chemical attachment system

Fastening type

Concealed fasteners

Thickness

6mm+

Outlet

Non-adjustable build-up

Certification

Sistema HC Slim

This solution is designed for both interior and exterior wall cladding using 6 mm thick Neolith panels. It features a hidden mounting system with a longitudinal chemical-elastic fixation applied to vertical ‘Omega’ profiles, placed directly at the joints between panels, and ‘Z’ profiles, positioned at the center of the panels to reinforce the attachment.

With a minimal space requirement of only 22 mm (7/8’’), this system is ideal for cladding walls with very limited build-up space. Please note that this system does not offer build-up adjustment, so the wall must be perfectly plumb to ensure proper installation and optimal results.

For optimal installation, a minimum horizontal and vertical joint of 5 mm between Neolith panels is recommended.

Se recomienda una junta mínima, tanto horizontal como vertical, entre los paneles de Neolith de 5 mm.

Distribution of the substructure and installation

Spacing between profiles depends on the facade cladding design (joint location), as well as the type of substrate, project wind loads, and structural assumptions.

Vertical profiles are anchored directly to the substrate with the appropriate fasteners.

A pull-out test may be required to determine the substrate’s load-bearing capacity before defining the profile spacing.

How to apply chemical fixation

Chemical fixation consists in the direct application of adhesive and double-sided self-adhesive strip to the vertical profiles. For optimal adhesion, it is essential to pre-treat both the Neolith panels and the vertical profiles. The general steps to be carried out are described below:

01. Cleaning

Both the profiles (once fixed) and the panels must be free of dust or any other contaminants that could compromise the bond. For extremely dirty panels, clean using acetone or methyl ethyl ketone (avoid using turpentine).

After allowing the cleaning products to evaporate for 10 minutes, apply the activator to both the profile and the back of the panel, focusing on the area that will align with the profiles. Use disposable cellulose paper to apply the activator, rubbing from top to bottom and always in a single direction (avoid circular motions). Repeat the application as many times as needed until the paper no longer gets stained. Use a new piece of paper for each application.

Once the primer has dried (approx. 25 minutes, depending on the manufacturer and atmospheric conditions), apply the double-sided adhesive strip vertically and continuously on the profiles. This strip is used for the initial fastening of the cladding panels until complete curing (or polymerization) of the adhesive, and to ensure the correct dimensions of the adhesive bead.

The adhesive should only be applied vertically and continuously, forming a triangular bead using the special V-shaped nozzle. It must always be applied between +5 °C (41 °F) and +35 °C (95 °F) of ambient temperature. Typically, two lines of elastic adhesive are applied along the vertical “T” profile, while a single line is applied on the “L” profile. Depending on the manufacturer, the adhesive must be applied within a maximum of 2 hours after the primer has been applied.

The Neolith panel should be placed within 10 minutes of applying the adhesive, after removing the protective film from the double-sided strip. Once the panel is correctly positioned, press it firmly onto the profiles to ensure full contact with the strip. After the panel has made contact with the strip, no adjustments can be made.

Other installation systems

VM System

VM System

Sistema HC

HC System

Sitema HC-R

HC-R System

Sistema HR

HR System

Sistema HU

HU System

Sistema Strongfix

Strongfix System